My Energi Zappi EV Charger Installation in Red Lodge, Bury St. Edmunds, Suffolk carried out by JDH Electrics. A new dedicated Electric Vehicle Consumer unit has been installed to serve the new charger – including a surge protection device. At the same time Ultra EV Steel Wire Armoured cable has neatly been cleated – which includes a separated data core to monitor the properties energy consumption and future solar additions using CT Clamps which feeds into the charger & app.
The EV Charger has been fully inspected & tested using the latest Kewtech device, including fault simulation for peace of mind. We have fully certified the project as well as a DNO & Building control notification.
Do you need an EV Charger installed? Contact us today for a free estimate!