Full & comprehensive EICR on a Listed Building in Tonbridge Five Oak Green carried out by JDH Electrics.

Some of the elements inspected & tested include:

  • Supply polarity and incomming earth
  • Consumer unit
  • Earth bonding to gas & water
  • Each individual circuit, to include presence of CPC / earthing conductors and to confirm correct polarity
  • Continuity of ring final conductors
  • Distribution circuit to shed & shed consumer unit
  • RCD opperation

At the time of the inspection & testing some observations were found which will need further action, such as a replacement consumer unit due to lack of RCD protection. Main equipotential bonding will need to be installed to the water pipe for safety, fault finding loose connections. Shower rewiring due to sockets spurred off of the shower circuit and replacement accessories. The immersion isolator has been overloaded with signs on overheating and requires replacement, and earthing connected to the metal light fittings.

Click here for to find out: What is an EICR / Electrical installation Condition Report and what does it involve?

Do you need an EICR? Contact us here for a free estimate